New Construction Front Door Installation
Learn from our product experts how to install Pella Aluminum-Clad, Fiberglass and Steel front doors in new construction applications. See the different installation methods used for front doors in a new building or when siding and trim has been completely removed.
New Construction Installation After Building Wrap For Nail Fin Aluminum-Clad Front Doors
A front door is installed on a stud wall with sheathing after the building wrap is in place. It is then attached using the nailing fin and integrated with the building using flashing tape.
New Construction Installation Before Building Wrap for Nail Fin Aluminum-Clad Front Doors
A front door is installed on a stud wall with or without sheathing before the building wrap is in place. It is then attached using the nailing fin and integrated with the building using flashing tape.
New Construction Installation with Water Resistant Sheathing for Nail Fin Aluminum-Clad Front Doors
A front door is installed on a stud wall with water resistant sheathing. It is attached using the nailing fin and sealed to the water resistant sheathing.
Full Frame Replacement Ater Brickmould or Trim Removal or Siding Cut-Back for Nail Fin Aluminum-Clad Front Doors
The existing door and wood brickmould/trim is removed. The new door with nail fin is sealed and attached to the wall in the opening left by the removal of the existing brickmould and door. Exterior trim is then used to cover the nail fin.
Front Door Panel in Aluminum Clad Exterior Door Frame Assembly Instruction
Instructions
description Front Door Panel in Aluminum Clad Exterior Door Frame (2024)








